![]() |
About CPC
|
|
Experience & Qualifications
CPC developed the "Winch Powered Docking System" in 2001/02 to enable conventional vessels the ability to dock alongside a pipe-laying barges while running anchor spreads in a safe and efficient way. To date, CPC's project teams have successfully loaded and docked more than 250 times alongside anchored pipe- laying vessels.
In mid-November 2001, across the volatile seas of the Bass Straits, CPC pioneered the "Arrowhead" stowage of pipes in the cargo hold. Utilising conventional single hold vessels, CPC increased the net carrying capacity surpassing any standard pipe supply vessels and cargo barges.
|
||||||||||||||||||||
| © 2008 Consolidated Pipe Carriers Pte Ltd. All rights reserved. | Employment Opportunities | Contact Us |